• Technip Norge AS

    Tekmar Subsea awarded multi-million pound contract by Technip Norge AS.

    Read news

  • Sapesco Libya

    Tekmar Subsea awarded pipeline repair clamp contract by Sapesco Libya.

    Read news

  • Acergy LARS

    Tekmar Subsea awarded Acergy contract to modify existing LARS.

    Read news

  • Walney Offshore Wind Farm

    Tekmar Energy awarded contract to supply Offshore Wind Farm Turbine cable protection systems to the Walney Offshore Wind Farm.

    Read news

  • Gravity Base Cable Protection System

    Tekmar Energy Supply Gravity Base Cable Protection System Prototype for Subsea Tidal Turbines.

    Read news

  • Tekmar Subsea seal hole in oil pipe wall

    Tekmar Subsea seal hole in oil pipe wall, saving 3,000 barrels of oil per day.

    Read news

  • Flare Stack Reinforcement

    Tekmar Subsea design and manufacture all equipment on a 21 day schedule, successfully install off the coast of Egypt.

    Read news

  • Teklink Cost Savings

    Teklink Achieves 70% Reduction in costs in offshore wind farm installations.

    Read news

Tekmar Group

The Tekmar Group head-office is in Newton Aycliffe, County Durham, England. The head office contains administration, engineering as well as a large manufacturing facility. Newton Aycliffe is perfectly positioned for access to the North East coast with good road access to Newcastle, Manchester, Liverpool and London.

 

The group mainly focuses on the Oil and Gas Industry and the Offshore Renewable Energy Sectors, providing a range of self designed and manufactured marine engineering solutions. These marine engineering solutions address subsea, topside and vessel based engineering challenges.

 

The Tekmar Group has a strong emphasis on very strong project management and quality assurance practices, and is qualified to the highest levels possible. Allied to this extreme professionalism is the belief that all of Tekmar’s marine engineering solutions plays a major role in protecting the environment.

 

In areas like pipeline protection it is essential that any leak or pipeline breakage is repaired as quickly as possible to limit any environmental or ecological damage. As part of Tekmar’s duty of care to the environment we believe that no pipeline or cabling system should be installed without adequate protection or without an excellent repair and damage recovery plan.