• Technip Norge AS

    Tekmar Subsea awarded multi-million pound contract by Technip Norge AS.

    Read news

  • Sapesco Libya

    Tekmar Subsea awarded pipeline repair clamp contract by Sapesco Libya.

    Read news

  • Acergy LARS

    Tekmar Subsea awarded Acergy contract to modify existing LARS.

    Read news

  • Walney Offshore Wind Farm

    Tekmar Energy awarded contract to supply Offshore Wind Farm Turbine cable protection systems to the Walney Offshore Wind Farm.

    Read news

  • Gravity Base Cable Protection System

    Tekmar Energy Supply Gravity Base Cable Protection System Prototype for Subsea Tidal Turbines.

    Read news

  • Tekmar Subsea seal hole in oil pipe wall

    Tekmar Subsea seal hole in oil pipe wall, saving 3,000 barrels of oil per day.

    Read news

  • Flare Stack Reinforcement

    Tekmar Subsea design and manufacture all equipment on a 21 day schedule, successfully install off the coast of Egypt.

    Read news

  • Teklink Cost Savings

    Teklink Achieves 70% Reduction in costs in offshore wind farm installations.

    Read news

Technip Pazflor Surf Field

Project no: 777

Project name: Technip Pazflor Surf Field

Project description: Tekmar Subsea

Project completion date: May 2009

 

Description of product

 

TEKSEAL® HT Pipe-In-Pipe Water-stop Seals

TEKSEAL® MECH Mechanical Clamps

 

The objective of the water-stop seal is to contain the seawater pressure if the outer carrier pipe is breached during installation or operation.

 

The mechanical clamps provide a structural support for the seal when exposed to the hydrostatic head from the water depth.

 

The TEKSEAL® pipe-in-pipe water-stop seal assembly is supplied to suit the specific project pipe sizes and pressure rating.

 

Client benefits provided by solution

The Pazflor project shall develop reservoirs located in Block 17, Angola.

 

Project Responsibilities

• TECHNIP Owners / operator of platform
• TEKMAR Water-stop seal supplier