• Technip Norge AS

    Tekmar Subsea awarded multi-million pound contract by Technip Norge AS.

    Read news

  • Sapesco Libya

    Tekmar Subsea awarded pipeline repair clamp contract by Sapesco Libya.

    Read news

  • Acergy LARS

    Tekmar Subsea awarded Acergy contract to modify existing LARS.

    Read news

  • Walney Offshore Wind Farm

    Tekmar Energy awarded contract to supply Offshore Wind Farm Turbine cable protection systems to the Walney Offshore Wind Farm.

    Read news

  • Gravity Base Cable Protection System

    Tekmar Energy Supply Gravity Base Cable Protection System Prototype for Subsea Tidal Turbines.

    Read news

  • Tekmar Subsea seal hole in oil pipe wall

    Tekmar Subsea seal hole in oil pipe wall, saving 3,000 barrels of oil per day.

    Read news

  • Flare Stack Reinforcement

    Tekmar Subsea design and manufacture all equipment on a 21 day schedule, successfully install off the coast of Egypt.

    Read news

  • Teklink Cost Savings

    Teklink Achieves 70% Reduction in costs in offshore wind farm installations.

    Read news

Technip Oilexco Shelley Project

Project no: 835

Project name: Technip Oilexco Shelley Project

Project description: Tekmar Subsea

Project completion date: November 2008

 

Description of product

 

Provision of Hang-Off Flange, Seal and Split Collar.

 

The purpose of the hang-off flange, seal and split collar assembly is to provide a structural support for the riser which can be sealed against the riser end fitting.

 

In principle the hang-off flange shall be installed with the maximum internal bore to permit the pull-thro of the riser end fitting. Followed by the installation of a split seal and collar arrangement.

 

Project Responsibilities

• TECHNIP Owners / operator of platform
• TEKMAR Hang-Off Flange supplier