• Technip Norge AS

    Tekmar Subsea awarded multi-million pound contract by Technip Norge AS.

    Read news

  • Sapesco Libya

    Tekmar Subsea awarded pipeline repair clamp contract by Sapesco Libya.

    Read news

  • Acergy LARS

    Tekmar Subsea awarded Acergy contract to modify existing LARS.

    Read news

  • Walney Offshore Wind Farm

    Tekmar Energy awarded contract to supply Offshore Wind Farm Turbine cable protection systems to the Walney Offshore Wind Farm.

    Read news

  • Gravity Base Cable Protection System

    Tekmar Energy Supply Gravity Base Cable Protection System Prototype for Subsea Tidal Turbines.

    Read news

  • Tekmar Subsea seal hole in oil pipe wall

    Tekmar Subsea seal hole in oil pipe wall, saving 3,000 barrels of oil per day.

    Read news

  • Flare Stack Reinforcement

    Tekmar Subsea design and manufacture all equipment on a 21 day schedule, successfully install off the coast of Egypt.

    Read news

  • Teklink Cost Savings

    Teklink Achieves 70% Reduction in costs in offshore wind farm installations.

    Read news

Successful Supply of Launch & Recovery Systems (LARS) for Sonsub Aberdeen

Project no: 860

Project name: Sonsub Launch and Recovery Systems

Project description: Sonsub HF – 135 LARS

Project completion date: January 2010

 

Tekmar have successfully completed the project for the supply of 2-off HF-135 Launch & Recovery Systems (LARS) for Sonsub Aberdeen.

 

The systems were specifically designed to meet Sonsub's requirements for a low freeboard and increased ROV handling.

 

One on the major requirement of Sonsub's specification was to release the ROV below deck level to reduce the pendulum effect during launch and recovery and reduce potential clashes with the vessel side.

 

The deck skidding module was designed as a stand-alone module capable of positioning the ROV and toolskid at any point along the LARS skidbase. The skidding pallet was a compact design that ensures large stack heights can be handled. The pallet was fitted with an electric motor drive and rack and pinion system that provided failsafe operation, safe handling of the supply cable and smooth operation of the pallet.

 

System Specification

- SWL: 15Te
- DAF: 3
- Out-reach: 6.5 metre
- Latching height below deck: 2.5 metres
- Dimensions: 4 metres wide x 9 metres long
- Stack height: 5521mm
- Third party certification: Det Norske Veritas

 

Client benefits provided by solution

Low freeboard
Increased ROV handling without clashes on vessel side

 

Project Responsibilities

• Sonsub Installation contractor
• Tekmar Subsea Equipment Supplier