Ormonde Offshore Project
Project no: 129
Project name: Ormonde Offshore
Project description: Tekmar Energy - Renewables
Project completion date: 2011 - Ormonde Offshore
Description of product
60 -off TEKLINK® Cable Protection Systems - 2011 Ormonde Offshore
The Ormonde Offshore Wind Farm is currently being built in the Irish Sea, 10km off Barrow-In-Furness. On completion the wind farm will comprise 30 RePower 5M wind turbines with the capacity of 150 megawatts and expected to produce around 500 gigawatt hours of electricity every year. This is sufficient to supply the equivalent of approximately 100,000 homes per year with clean power. The turbines will cover an area of 8.7km2.
The Ormonde Offshore Wind Farm is now in the construction phase with onshore works having commenced in autumn 2009. The development work is due for completion during 2011 and first power is expected later that year.
Client Requirement
Long term cable protection for extended service life.
Tekmar solutions
Articulated Guide, progressive bend stiffener, locking latch body, dynamic bendstiffener, polyurethane (PU) bend restrictor, cast iron weighted bend restrictor
Client benefits provided by solution
• Simple and rapid marine installation method
• Long term dynamic protection of cable
• Finite design of components and verification of individual function
• Sub sea corrosion resistance
Project Responsibilities
| • VATTENFALL | Owners / Developers |
| • PRYSMIAN | Cable supplier |
| • VSMC | Installation contractor |
| • TEKMAR | Cable protection system supplier |
| • REpower | Wind turbines |