• Technip Norge AS

    Tekmar Subsea awarded multi-million pound contract by Technip Norge AS.

    Read news

  • Sapesco Libya

    Tekmar Subsea awarded pipeline repair clamp contract by Sapesco Libya.

    Read news

  • Acergy LARS

    Tekmar Subsea awarded Acergy contract to modify existing LARS.

    Read news

  • Walney Offshore Wind Farm

    Tekmar Energy awarded contract to supply Offshore Wind Farm Turbine cable protection systems to the Walney Offshore Wind Farm.

    Read news

  • Gravity Base Cable Protection System

    Tekmar Energy Supply Gravity Base Cable Protection System Prototype for Subsea Tidal Turbines.

    Read news

  • Tekmar Subsea seal hole in oil pipe wall

    Tekmar Subsea seal hole in oil pipe wall, saving 3,000 barrels of oil per day.

    Read news

  • Flare Stack Reinforcement

    Tekmar Subsea design and manufacture all equipment on a 21 day schedule, successfully install off the coast of Egypt.

    Read news

  • Teklink Cost Savings

    Teklink Achieves 70% Reduction in costs in offshore wind farm installations.

    Read news

Kashagan Project

Project no: 832

Project name: Parker Scanrope Diver Installed J-Tube Seals

Project description: Tekmar Subsea

Project completion date: April 2009

 

Description of product

 

2-off Ø 167 mm Methanol Diver Installed J-tube Seals,
2-off Ø 155 mm Chemical Diver Installed J-tube Seals

 

The purpose of the Diver Installed J-tube Seal is to provide a permanent seal between an existing J-tube and a newly installed umbilical and provides an annulus which may be treated with corrosion inhibitor. The diver installed j-tube seals are designed to be installed after the main pull-in operation is complete.


The diver installed j-tube seals are designed to be installed after the main pull-in operation is complete. The sealing unit is mounted onto the back of a split steel front flange and comprises of two elastomeric seals, a middle flange and rear centralising flange. The assembly is constructed in two sections to facilitate built up around the installed umbilical.

 

Client Requirement

Extended J-Tube Life

 

Tekmar solutions

J-Tube Seal

 

Client benefits provided by solution

Extended J-Tube Life

 

Project Responsibilities

• PARKER SCANROPE Owners / operator of platform
• TEKMAR J-Tube seal supplier